Principal-logotipo

Launch of the SIMAR Project

The HE SIMAR Project is pleased to inform you about the official start of the project on the 1st of September.

The SIMAR Project is a Horizon Europe Project whose proposes a new type of inspection robot that is composed of an aerial system with advanced navigation capabilities that will allow to safely land on pipes, even if they are located in complex and cluttered locations and deploy untethered and light-weight crawlers to perform complete inspections of insulated pipes.

The Kick-off-meeting of the project will take place from 4th to 6th of October, in CATEC facilities (Seville). This will be organised by CATEC, Project Coordinator, and will be attended by various members of the whole consortium.

 

The 1st day will be focused on the presentation of each WP, and set an starting point for the project.

Below is the agenda we have prepared for the organization of the activities:

 

Day 1: October 4th

  • 9:00-9:15: Welcome.
  • 9:15-10:00: Partners presentation (5 min presentation for each partner).
  • 10:00-11:00:
    • WP1: Project Management and coordination.
    • D1.1 Project Management Handbook (M2).
    • D1.2 Data management Plan (M6).
  • 11:00-11:30: Coffee break.
  • 11:30-12:00:
    • WP2: System Specification and Design.
    • D2.1 SIMAR system specifications, validation scenarios, and KPIs (M6).
  • 12:00-12:30: WP3: Multipurpose Modular Inspection Robot.
  • 12:30-13:00: WP4: Intelligent support of workers.
  • 13:00-13:30: WP7: Exploitation, communication, and dissemination.
  • 13:30-15:00: Lunch
  • 15:00-15:30:
    • WP8: Social, Ethical and Legal (SoEL) Issue.
    • WP9: Ethics requirements.
    • D9.1 OEI - Requirement No. 1 (M6).
  • 15:30-16:00: Workshop: VES inspection procedures and equipment in general and for insulated pipes.
  • 16:00-16:45: Workshop: CHEVRON inspection procedures, site, and equipment used for general inspection and insulated pipes.
  • 16:45-17:30: Workshop: BASF inspection procedures and equipment used for general inspection and insulated pipes.
  • 20:30: Social Dinner

 

Day 2: October 5th

The main remarkable activities that will take place during the second day are two:

  • A Workshop where the project general concept will be discussed.
  • Two workshops about the first and second requirements capture.

 